Dağkent Bolu 1. and 2. Temporary Settlement Houses Drinking Water Construction

Administration: General Directorate of Iller Bank

Job description: Sewage network lines and their inspection chambers, parcel manholes and connections, septic tank construction and site arrangement.

Provisional acceptance date: 08.12.2000