Adapazarı Karamanköy Permanent Residences

Administration: General Directorate of Iller Bank

Job description: Doğan İnşaat and Özalp Group, which took charge in the region after the 1999 earthquake, worked on 850.000 m3 excavation, 45.000 m sewage and storm water, 300.000 m2 parquet road construction, 35.000 m concrete asphalt (double road) and road lighting construction, 40.000 m drinking water construction (main collector, secondary connection). ), 175.000 m2 field lawn and 45.000 landscaping plants and tree planting works have been completed in a short time with high quality.

Provisional acceptance date: 02.08.2002